Pine’s scope:
Low Voltage switchboards’ and Medium Voltage switchgears’ engineering documentation, manufacture and FAT (Factory Acceptance Tests) for La Muela II hydroelectric power plant, which Client is Iberdrola Generación S.A.U.:
La Muela II hydroelectrical power plant, in Valencia, is part of the Cortes – La Muela hydroelectric exploitation, along with La Muela I and Cortes II power stations. The pumping jump of La Muela II uses the intakes of the upper water reservoir of La Muela and Cortes, built in the first phase. It is an underground power station that has four equal reversible groups (groups 4, 5, 6 and 7) with a total pump power of 712MW and a total turbine power of 852MW.
Pine’s scope:
Low Voltage switchboards’ and Medium Voltage switchgears’ engineering documentation, manufacture and FAT (Factory Acceptance Tests) for La Muela II hydroelectric power plant, which Client is Iberdrola Generación S.A.U.:
La Muela II hydroelectrical power plant, in Valencia, is part of the Cortes – La Muela hydroelectric exploitation, along with La Muela I and Cortes II power stations. The pumping jump of La Muela II uses the intakes of the upper water reservoir of La Muela and Cortes, built in the first phase. It is an underground power station that has four equal reversible groups (groups 4, 5, 6 and 7) with a total pump power of 712MW and a total turbine power of 852MW.
Project delivered by Pine
IBERDROLA