About This Project

IEEE Standard electrical equipment supply for Los Azufres Geothermal Power Plant

Project delivered by Pine

Pine’s scope:

The plant, that has an output of 25 MW and is located in the province of Michoacán, will have an annual average power generation up to 200 Gigawatt hours per year.

Pine’s scope within this project includes the complete design and manufacture of the electrical equipment, inspections and factory acceptance tests, surface treatment and painting, packaging, loading and transportation, insurance, training, commissioning, documentation and warranties.

  • 7 4,16 kV panels to be installed in compliance with IEEE C37 standard, the Official Mexican Regulation (NOM) and the current Mexican specifications that are applicable to the project (NMX).
  • Armoured metallic switchgears for 4,16 and 7,2 kV rated voltage.

Pine’s scope:

The plant, that has an output of 25 MW and is located in the province of Michoacán, will have an annual average power generation up to 200 Gigawatt hours per year.

Pine’s scope within this project includes the complete design and manufacture of the electrical equipment, inspections and factory acceptance tests, surface treatment and painting, packaging, loading and transportation, insurance, training, commissioning, documentation and warranties.

  • 7 4,16 kV panels to be installed in compliance with IEEE C37 standard, the Official Mexican Regulation (NOM) and the current Mexican specifications that are applicable to the project (NMX).
  • Armoured metallic switchgears for 4,16 and 7,2 kV rated voltage.

Project delivered by Pine

Client

CFE

Sector

Energy

Location

Mexico

Year

2017