Pine’s scope:
The railway segment between Herrera and Altza stations (Donostialdea subway) has a length of 1.040 metres under the ground. Altza’s new station, built 28 metres under the ground, has 2 halls and two accesses.
The station has two side platforms. Each platform has two stairs that take the users to both halls, located in the mezzanine floor. There are also two elevators that connect the platforms with the mezzanine and the street.
Pine’s scope within this project includes the following activities:
Pine’s scope:
The railway segment between Herrera and Altza stations (Donostialdea subway) has a length of 1.040 metres under the ground. Altza’s new station, built 28 metres under the ground, has 2 halls and two accesses.
The station has two side platforms. Each platform has two stairs that take the users to both halls, located in the mezzanine floor. There are also two elevators that connect the platforms with the mezzanine and the street.
Pine’s scope within this project includes the following activities: